Cravencroft News

cravencroft contacts image 1
Cravencroft About Us Photo 1b
Cravencroft Carshalton Boys Sports Colle
1/1

Recently Completed

Carshalton Boys Sports College
Project Duration: 24 weeks
Contract Value: £485k

Works were carried out between March to September 2019, works consisted of the construction of a new 3 class standalone maths block to the rear of the school and the introduction of a mezzanine structure through the school hall during the summer shut down period to form a new library area. The build consisted of 12m deep piled foundations with ground beams, substructure brickwork and a 225mm beam and block floor system.

 

The superstructure was constructed from conventional masonry work with a timber / steel flat roof structure, single ply warm roof system and concrete coping stones to the parapets. Heating and cooling is provided by ceiling mounted cassette system, all wall and ceiling finishes received a plastered finish.

 

 

 

cravencroft contacts image 1
Cravencroft About Us Photo 1b
Cravencroft Carshalton Boys Sports Colle
1/1

Recently Completed

Carshalton Boys Sports College
Project Duration: 24 weeks
Contract Value: £485k

Works were carried out between March to September 2019, works consisted of the construction of a new 3 class standalone maths block to the rear of the school and the introduction of a mezzanine structure through the school hall during the summer shut down period to form a new library area. The build consisted of 12m deep piled foundations with ground beams, substructure brickwork and a 225mm beam and block floor system.

 

The superstructure was constructed from conventional masonry work with a timber / steel flat roof structure, single ply warm roof system and concrete coping stones to the parapets. Heating and cooling is provided by ceiling mounted cassette system, all wall and ceiling finishes received a plastered finish.

 

 

 

Cravencroft Logo.png